GTL PLANT MORE ECONOMIC? |
|
|
GTL PLANTS ARE EXPENSIVE TO BUILD AND OPERATE, THEY ARE VERY COMPLEX
BOTH SASOL AND SHELL BUILT VERY COMPLEX PLANTS IN A DESERT IN ALASKA THE GTL PLANT WILL BE MUCH SIMPLER BUT CONSTRUCTION HOW HAVE ALASKAN ENERGY COMPANIES BUILT MEGA COMPLEX PLANTS IN MODULAR FORM, LOADED ON BARGES, SEA LIFTED TO THE NORTH SLOPE
MANY OF THE ORIGINAL NORTH SLOPE FACILITIES WERE CONSTRUCTED THIS WAY
ARCO ONE THE ORIGINAL DEVELOPERS OF THE PRUDHOE BAY FIELD USED A SIMILAR BUT THEY BUILT THE 600,000 BBL/D SALTWATER TREATING PLANT (STP) ON A BARGE, TOWED THE LEFT AND RIGHT PHOTOS ARE OF THE STP FACILITY LOCATED AT THE END OF A MANMADE THE STP FACILITY WAS FLOATED INTO PLACE AND THEN BALLASTED
THE ARCO STP IS A LARGE PROCESS UNIT BUT FOR A GTL PLANT THE FORTUNATELY, SHELL HAS LED THE WAY WITH LARGER (MEGA) SHIPS/BARGES THE SHELL PRELUDE IS 1,600' LONG AND 240' WIDE BUT FOR
THE NORTH SLOPE IT MIGHT TAKE TWO OF THESE MONSTER BARGES TO HOLD A 240,000 BBL/D GTL PLANT A 120,000 BBL/D PLANT OR MODULE ON EACH. THIS COULD ALLOW FOR FURTHER EXPANSION OR |